FSN Jack Up Floating Floor Isolation Mounts

We believe that the most fool-proof and safest way to establish the air gap is the jack-up or lift-slab method. The FSN system ensures there is no bridging of the two elements due to slurry ingress.
Plastic sheeting is placed on the sub-floor as a breaker layer, isolators are placed on the plastic sheeting, reinforcing steel or mesh rests on the isolator housings and the concrete floor is poured. After the concrete has cured, the slab is lifted to elevation by turning adjustment bolts above each isolator to any specified air gap between 25mm -100mm.

The Mason FSN Jack Up floor system does not need to be jacked into position immediately. It can be left sitting on the structural slab enabling upper floor props to be installed and formwork cycle to continue for floors above.

All of the Mason FSN Jack Up Floor rubber mounts have a 3X overload built in to enable heavy equipment to be rolled over the slab into position.

Applications – Seismic & Non-Seismic

·         Generator Plant Rooms

·         Mechanical Plant Rooms

·         Gymnasiums

·         Operating Suites

Capacity

·         152kg – 1588kg per mount

Deflection

·         5mm – 8mm

Options

·         Seismic Snubber (SFFS)

·         Floor Drain (CFD)

Specification

Bell shaped castings with integral lugs to locate reinforcing, shrouding 50mm thick LDS isolators moulded to the following and all other AASHTO bridge bearing specifications. All housings shall have (20mm) minimum diameter jackscrews. Deflections shall not exceed 8mm nor the frequency 9 Hz. Isolators shall be Mason Industries type FSN.

FS Jack Up Floating Floor Isolation Mounts

Situations arise where there is a requirement for a lower natural frequency in the floating floor elements that what can be achieved by a rubber isolator.
We have engineered purpose build jack up isolators which house springs. The springs are installed once the concrete is poured. The slab is jacked into position in the same manner our our FSN type jack up isolators.
Plastic sheeting is placed on the sub-floor as a breaker layer, isolators are placed on the plastic sheeting, reinforcing steel or mesh rests on the isolator housings and the concrete floor is poured. After the concrete has cured, the slab is lifted to elevation by turning adjustment bolts above each isolator to any specified air gap between 25mm -100mm.

Applications – Seismic & Non-Seismic

·         Generator Plant Rooms

·         Mechanical Plant Rooms

·         Gymnasiums

·         Operating Suites

Capacity

·         204kg – 1331kg per mount

Deflection

·         25mm – 50mm

Options

·         Seismic Snubber (SFFS)

·         Floor Drain (CFD)

Specification

Cylindrical shaped castings with integral lugs to locate reinforcing, shrouding 25-50mm deflection spring isolators. All housings shall have threaded compression plates and a neoprene cup to the base of the spring. Isolators shall be Mason Industries type FS.